The new volumes are designed to be very compact, with a minimal footprint on the ground, to maximize permeable surfaces dedicated to “functional” green areas. The public park, created with native vegetation, aims to reduce the heat island effect, provide shade, mitigate traffic noise, and improve the local microclimate.
Leggi tuttoZero Emission Cluster
New Unified Municipal Headquarters of L'Aquila
The masterplan of the area is organized with the municipal service activities located and confined to the northwest section, while the southeast area is completely open and permeable, featuring a public park that extends parallel to the city walls.
Info
Premi e Riconoscimenti Concorso – 3° classificato
Committente Provincia dell’ Aquila
Superfici lotto 30.000 m2, Edificio 2.500 m2
Frigerio Design Group
Coordinamento generale
Progetto Architettonico
Collaboratori E. Frigerio con S. Rota, A. Chiappini, F. D’Andrea
Strutture ing. Gianluca Buscaglia
Impianti Planex
Prevenzione incendi e CSP C. Manfreddo
Progetto del Verde Open Fabric
Date
concorso 2021
Slow Architecture
- Comfort sensoriale.
- Struttura in legno.
- Illuminazione naturale.
- Masterplan verde.
- Prefabbricazione.
- Modularità dei componenti.
Premi e Riconoscimenti
- Concorso internazionale – 3° classificato
